𝐏𝐫𝐨𝐣𝐞𝐜𝐭: Ali Center, Murree Road Rawalpindi.
𝐀𝐫𝐞𝐚: 24,000 Sq ft,
𝐉𝐚𝐳𝐚𝐫𝐢 𝐒𝐭𝐞𝐞𝐥 Manufactured and installed two floors in steel structure above three floors of concrete structure. RCC encasement was applied on Columns and SCIP deck was fixed on this structure which acted as floor. Thus, the combination of steel structure and deck floor will replace your concrete building.
𝐀𝐝𝐯𝐚𝐧𝐭𝐚𝐠𝐞𝐬:
Light weight
Quick Construction
Save Money and time
Efficient against earthquake.